Client: SEDAPAL
Location: Lima
Date: 2011
It was implemented in conjunction with the Control Center of the Huachipa Drinking Water Treatment Plant (PTAP), made up of 6 50 ”buckets in a 2 x 3 arrangement (2 rows x 3 columns) with LED retro projection technology, in the videowall system visualizes the SCADA system and the continuous operation of the plant.