About the project
Client: Sociedad Eléctrica del Sur Oeste S.A. (SEAL)
Location: Arequipa
Date: 2019
SEAL currently distributes electric power throughout the Arequipa region, with energy from the National Interconnected System, still maintaining generation through a few Isolated Systems, which must be replaced in the short term by said system.
SEAL, in order to integrate the information of the relays it has, made the purchase of terminal servers. Additionally, the training of personnel in the configuration and management of this equipment was considered.
Galería


