Client: Osinergmin
Date: 2008
The SCADA / ICCP redundant system was updated for the information management of natural gas companies and the continuity of the supervision operation of the electrical inspection management that integrates in real time all the signals that the COES receives from the SEIN member companies.
Likewise, the signals from 3 centrals belonging to the isolated systems were integrated. The system was put into operation in 2008 and to date it remains in force with maintenance, support and update services.