Smart Metering System – Electrosur

The LPWAN ELECTROSUR Smart Metering System Project consists of the installation of 02 Access Points in the city of Tacna. This equipment emits a radiofrequency signal that allows communication with more than 20 thousand meters per Access Point. The pilot project consists of a total of 1,500 meters and management software installed on the manufacturer’s servers, which can be accessed via the Internet to manage readings, outages, interruption detection, profile downloading, among other actions.