about project
Client: Ende DeOruro
Location: Oruro, Bolivia
Date: 2020
Implementation of a videowall system for the Control Center of the National Electrification Company Ende DeOruro, in Bolivia. Screens in 3×2 configuration, 1 controller and an engineering station were installed for continuous 24×7 monitoring of the operation of the Power Electric System.
The implementation stages were:
– Basic and detail engineering
– Supply of 6 displays, videowall controller and engineering station
– Assembly and installation
– Videowall system configuration
– SAT tests
– Commissioning of the project
– Staff training