about the project

Client: Minera Santa Luisa

Date: 2019

 

 

We carry out the maintenance of the redundant SCADA / ICCP system for the integration of signals from 2 power substations: SE Huallanca Nueva and SE Vizcarra, to comply with the sending of ICCP data to COES in real time. The system was put into operation in 2008 and continues in force until today. Said SCADA system integrates 3 General Electric Model D25 RTUs in DNP3 protocol which integrate signals from SEL 311, SEL 352, SEL 345 protection relays, ION 8500 meters and wired signals from switchyard equipment.

 

 

This maintenance service was able to optimize the delivery in ICCP protocol to the COES in order to comply with the NTIITR standard of the COES. 

 

Finally, we installed ARCTEQ protection relays for your feeders and generating sets.

Galería

Testimonios

Testimonios de clientes

Blog

Innovación | Noticias y Artículos

Experiencia

Otros Proyectos similares

Contact Us

We create channels to be in constant connection.

Landline: 445-7660

Atenttion: 8:30 AM – 6:30 PM

WhatssApp: (+51) 977 753 239

Atención: 24 horas

How can we help you?

We are always there for you!

Send us your inquiry and we will contact you shortly.

Are you interested in implementing the solution within a 6-month period?