The project consisted of the modernization of the control and SCADA system of the Pías hydroelectric power plant. The Pías hydroelectric power plant located in the province of Pataz, department of La Libertad, belongs to Consorcio Minero Horizonte, and consists of 02 generation units, each with 6.3 MW of power. 

Scope: Procetradi was responsible for the modernization of the level 2 control system, which included the plates and accessories of the generation group, the lubrication system, the ball valve and the speed governor. In addition, the replacement and modernization of the level 3 control system, which included the SCADA, was carried out. 

Benefits: 
– Increase the reliability and availability of the plant’s generation units. 
– Decrease the probability of failures and forced shutdowns of the power plant due to age and obsolescence of the control system.
– Remote regulation of the active and reactive load of the units, which allows optimizing resources during plant operation.
– Reduce the risk of personnel accidents in the work area and reduce the probability of damage to the main components of the generation unit.
– Provide updated and transparent information to the client in such a way that it can improve the analysis, diagnosis and response time to failures or events of the generation units of the power plant.

Galería

Testimonios

Testimonios de clientes

Blog

Innovación | Noticias y Artículos

Experiencia

Otros Proyectos similares

Contact Us

We create channels to be in constant connection.

Landline: 445-7660

Atenttion: 8:30 AM – 6:30 PM

WhatssApp: (+51) 977 753 239

Atención: 24 horas

How can we help you?

We are always there for you!

Send us your inquiry and we will contact you shortly.

Are you interested in implementing the solution within a 6-month period?